Can I Pull My Own Permit in Clackamas County?

By Anthony, AMA Construction Enterprises · Oregon CCB #125736 · Updated November 5, 2026

Clackamas County lets a homeowner apply for electrical, mechanical, and plumbing permits on their own residence. Structural work runs a different path.

For some of the work, yes. Clackamas County has a basic homeowner application for electrical, mechanical, or plumbing work on your own residence. Structural work follows a separate application and review. Inside Sandy city limits, the city handles structural, mechanical, and plumbing work, while electrical permitting goes to the county.

What the county lets a homeowner apply for

Clackamas County publishes a basic homeowner permit path for people doing mechanical, electrical, or plumbing work on their own residence or home-based business. Electrical covers updating wiring. Mechanical covers heating, cooling, piping, venting, and wood stoves. Plumbing covers water, sewer, and storm drain lines and fixtures.

The county homeowner checklist calls for these documents. The permit application for whichever trade you're working in. A Project Description worksheet, where the county wants you to say in detail what you plan to do. And a Property Owner's Statement, which the county requires from applicants who are not licensed with the Construction Contractors Board.

That third form is the one worth reading before you sign it. It exists because an unlicensed person is about to take responsibility for permitted work on a house. Read it before applying, and ask the building office about any part you do not understand.

Structural work is a different application

A structural permit covers remodeling or altering existing space, adding square footage, and new construction. That is not the homeowner trade path, and it does not move at the same speed. The county building application page lists an initial pre-screen of up to 10 business days, followed by plan review of three to seven weeks depending on project complexity. Those are published estimates, not a promised completion date for your job.

Compare that to the trade permits. The county's basic homeowner instructions say this trade-permit process does not require plan review or Development Direct. They tell homeowners to email the completed documents to Building Codes. Follow that application route rather than assuming the contractor's online process applies to you. Use the county's instructions for the permit you actually need instead of carrying that faster trade-permit expectation into a structural project.

People get burned on this when they plan a remodel around the two-week timeline they heard about from a neighbor who replaced a water heater. Those are not the same permit.

Why the CCB sounds like it says the opposite

The Oregon CCB's consumer page says, under its reasons to use a licensed contractor, "Only licensed contractors are able to get the required building permits." Read that alongside the county's separate homeowner application, rather than treating it as the only instruction for every situation. If you are hiring help, the CCB's warning below is the part to discuss with them.

Look at what the same page says under "Acting as your own General Contractor": "You may be considered an employer if you use workers not licensed by the Construction Contractors Board to help build or remodel your home." The CCB warns that being treated as an employer brings tax-withholding, insurance, and other responsibilities, including obtaining permits.

Two different situations wearing the same clothes. You, doing the work on your own house, going through the county's homeowner path. Versus you, paying somebody unlicensed and pulling the permit so they can work under it. The second one can make you an employer under the CCB's warning. That is a separate question from whether the county accepts your permit application. Ask the CCB about your arrangement before hiring unlicensed help.

What to check if somebody else does the work

The permit and the person doing the work are separate things to check. The CCB's complaint guidance says it can help resolve a complaint only if the contractor was licensed during your construction project. If you are doing all the work yourself, there is no hired contractor responsible for that work. If you hire someone, check their license rather than treating a permit as a substitute for that check.

The same CCB page sets deadlines for complaints. For defects in a new structure, an owner has one year from first occupancy or two years from substantial completion, whichever comes first. For work on an existing structure, the deadline is one year after substantial completion. The page also requires a 30-day pre-complaint notice sent to the contractor by certified mail before filing. Ask the CCB how those rules apply to your situation instead of guessing from whose name appears on a permit.

Inside Sandy city limits

Sandy runs its own Building Division, responsible for the city's structural, mechanical, and plumbing processes. One line on that page catches people: for electrical inspection or permitting, the city tells you to contact Clackamas County.

So a Sandy homeowner redoing a bathroom can be dealing with two offices on one job. Plumbing through the city, electrical through the county. Sort that out before you start, not after you've got a wall open.

Ask who is pulling it before you sign

I'm not going to be your cheapest bid, and I'll tell you that up front. Where price gets interesting is in what a bid leaves out. If the one you're holding says nothing about permits, ask directly: who is pulling them, and is that in the number? A bid that comes in lower because nobody accounted for a permit is not actually a lower bid.

Before you apply

Everything above is the general shape of it. Your lot and your jurisdiction move the answer, and so does how far into the walls you're going. Call Clackamas County Building Codes, or the City of Sandy if you're inside the city, describe the actual work, and get them to tell you which permits apply before you order materials.

Questions people ask

Can I pull a permit for my own house in Clackamas County?

For electrical, mechanical, and plumbing work on the residence you live in, yes. The county has a basic homeowner path for exactly that. You submit the trade permit application, a Project Description worksheet, and a Property Owner's Statement if you aren't licensed with the Construction Contractors Board.

Can I pull my own structural permit too?

A structural permit is a different application and it goes through plan review, not the basic homeowner path. The county's pre-screen alone can take up to 10 business days, with plan review running three to seven weeks after that depending on how complex the project is.

Why does the CCB say only licensed contractors can get building permits?

Read the CCB consumer guidance alongside the county homeowner application. The CCB warns that using unlicensed workers to help build or remodel your home may make you an employer, with tax-withholding and insurance obligations. Ask the CCB how that warning applies to the help you plan to hire.

Does any of this change inside Sandy city limits?

Yes. Sandy's Building Division runs structural, mechanical, and plumbing permits inside the city, but the city sends you to Clackamas County for electrical permitting and inspection. One bathroom job can touch both offices.

What should I check if I hire someone to help?

Check whether the contractor is licensed. The CCB says it can help resolve a complaint only if the contractor was licensed during the construction project. Its consumer page also warns that using unlicensed workers can make you an employer, with additional responsibilities.

Sources

About Anthony

I'm Anthony. I've been building and remodeling around the Portland metro area since 1997, and I do the work myself. I won't be your lowest bid. I will tell you the truth, keep your house clean, and build it to last. Se habla español.